Skip to main content
VUONG PHAM, home
Flagship ProductStatus: Alpha

VPbuild

Quick declaration, traceable figures.

Define the building once and get traceable quantities. Alpha includes mobile modelling, structural and finish quantities and Excel output; DXF, PDF and cost remain on the roadmap.

Category
Construction Tech
Platforms
Android
Last update
Quantity screen grouped by construction sequence. The beam concrete line is open, showing the calculation for beams D1, D2 and D3. Excavation is marked as having no norm yet.
1/6 · Quantities by trade. Interface concept, September 2026; figures are illustrative.

01

Why it exists

Building quantities are usually measured by hand from drawings and retyped into spreadsheets. When the geometry changes, the measuring starts again, and the final figures lose their link to the elements they came from.

Errors are hard to find, revisions are slow, and nobody can answer “where does this number come from?” without redoing the work.

02

Who it is for

  • Site engineers and estimators

    Need townhouse quantities they can check, explain and revise quickly, without going back to a desktop.

  • Small contractors and design-build teams

    Need project-wide figures from one model instead of many disconnected spreadsheets.

03

What it does

  • Declare the building with numbers

    Floor cells, walls, doors and columns are entered as dimensions on an Android phone: metres for the plan, millimetres for members. Rooms are detected automatically.

  • Get structural and finish quantities

    Columns, beams, slabs, slab reinforcement and foundations, plus finishes by room, all calculated from the model.

  • Trace every figure

    Open a line to see each element's contribution, then tap a trace to jump to that element on the plan. Lines without a matching norm are flagged, not hidden.

  • Export to Excel in Vietnamese or English

    The report language is independent of the app language. Both files carry identical numbers.

04

How it works

  1. 01Available in Alpha

    Declare floors

    Build the plan from floor cells typed in metres. Add cells from an edge, and move a vertex to follow a skewed lot boundary.

  2. 02Available in Alpha

    Architecture

    Place walls, doors and columns on the cells. Closed areas become rooms with clear areas and finish specifications.

  3. 03Available in Alpha

    Structure

    Suggest a beam frame, generate foundations from ground-floor columns and declare slab reinforcement runs, then adjust.

  4. 04Available in Alpha

    Calculate

    Quantities grouped in construction sequence, by floor, by room and for reinforcement.

  5. 05Available in Alpha

    Trace

    Every line opens into the elements and dimensions behind it.

  6. 06Available in Alpha

    Export

    Excel workbook in Vietnamese or English, with a warning if any wall face has no material yet.

  7. 07Roadmap, not available

    Drawings and cost

    DXF, PDF, labour, equipment rates and preliminary cost.

Example

A 5 × 12 m, three-storey townhouse (illustrative figures from the interface concept): 38.62 m³ of concrete and 4,215 kg of steel for the whole building. Opening “Beam concrete M250, 2.592 m³” lists each beam, for example D2 on grid 2: 0.2 × 0.23 × 4.60 = 0.212 m³. Foundation excavation is marked “no norm yet” instead of being given a guessed code.

05

What makes it different

  • Numbers, not drawing

    Designed for one hand on a 6-inch screen: every dimension is a number field, dragging only picks a position, and one mode is active at a time.

  • Suggest first, adjust later

    The app proposes perimeter walls, the structural frame, the foundation plan and default slab reinforcement. Every step can be undone.

  • Model first, project wide

    Quantities come from one building model, so a change in geometry updates every dependent figure.

  • Traceable by design

    The data model keeps the path from each element to each line of the schedule.

  • Built from site practice

    Rules follow how Vietnamese construction teams actually measure and report work.

06

Current status

Status: Alpha

An early build is being tested by the maker or a small technical group.

Alpha: the build runs on test devices and is checked against reference quantities. Access is by invitation.

Access

Request Alpha access with a short description of your project type. Invitations are limited while the test group is small.

Current limitations

  • DXF, PDF, labour, equipment rates and preliminary cost are not available in the Alpha.
  • Only supported element types are calculated. Check results against project drawings before use.
  • The first release targets townhouses (nhà phố) on Android. Other building types and iOS are not supported yet.
  • Alpha builds are distributed to invited testers only.

Alpha evidence, September 2026

Test building, declaration to quantities
6 min 45 s
Single Alpha run
Deviation from reference quantities
0.5%
Same test building
Automated tests
1,300+
Alpha test suite
Devices with Alpha installed
2
Maker test devices

Recorded on Alpha test cases. These are development measurements, not general performance guarantees.

07

Roadmap

Now

  • Alpha testing on real buildings
  • Refine the Excel quantity schedule

Next

  • DXF and PDF output
  • Wider external test group

Later

  • Labour and equipment rates
  • Preliminary cost

No dates are shown unless they are committed.

08

Engineering and trust

  • Test approach

    More than 1,300 automated tests cover geometry and quantity rules. Test buildings are compared with independent reference takeoffs.

  • Accuracy is stated, not assumed

    Measured deviation is published with its date and test context. Unsupported cases are listed as limitations.

  • Offline project files

    Each project is a single file on the phone and opens without a connection.

  • Missing data is labelled

    Lines without a norm and wall faces without a material are flagged in the app and noted in the exported file.

09

Releases and product updates

  1. Alpha evidence recorded

    Test building completed in 6 min 45 s with 0.5% deviation from the reference takeoff. Test suite passes 1,300+ cases.

10 · VPbuild

Get the product

The Alpha is shared with a small group of invited testers. Tell me how you would use it to request access.

Request Alpha